USF has almost 50,000 students and the cost of doing business there is massively lower there than in Connecticut. It costs under $10k to attend instate, and under $20k oos. They are not a peer.
They are a peer in conference realignment deck of card shuffling.

So what you are saying is a similar size stadium in Storrs would be higher than $340m not closer to $100,000,000?
 
Joined
Apr 2, 2024
Messages
195
Reaction Score
398
They are a peer in conference realignment deck of card shuffling.

So what you are saying is a similar size stadium in Storrs would be higher than $340m not closer to $100,000,000?
You're right, in conference realignment, even Tulane, Memphis and Duke are somehow peers.

I would expect a new CT stadium to be in a similar ballpark to Northwestern's, $800m for 35,000 seats. Pricey.
 

UconnU

If he blocks 100, he blocks 100
Joined
Aug 26, 2011
Messages
7,766
Reaction Score
31,524
Will they finally be taking the blue banner/header net thing over the entrances and wrapping it all the way around? Please?
 
Joined
Mar 4, 2020
Messages
3,665
Reaction Score
7,531
That's what The Rent cost over 20 years ago. With mostly bench seats.
That’s why I said almost, and so you’re saying the cost to build has more than tripled in 20 years?
 

FfldCntyFan

Texas: Property of UConn Men's Basketball program
Joined
Aug 25, 2011
Messages
13,236
Reaction Score
47,530
That’s why I said almost, and so you’re saying the cost to build has more than tripled in 20 years?
Likely more than tripled. Concrete (a massive part of the construction costs) doubled from 2000-2010; doubled again from 2010-2019 and nearly doubled again from 2019 until now (last one primarily due to a combnation COVID limiting supply lines and thhe current inflationary environment).

What would concern me most would be the site prep. The Rent was relatively affordable in large part due to the land being donated. While an on campus football stadium likely would be built on school owned land (no additional costs for land acquisition), there are a number of areas with wetland concerns in and around the campus. Site prep to stabilize the land base for a stadium and also prevent the possibility of contaminating the surrounding water table with runoff could easily run tens of millions of dollars before any construction begins.
 

CL82

NCAA Men’s Basketball National Champions - Again!
Joined
Aug 24, 2011
Messages
59,382
Reaction Score
221,839
Likely more than tripled. Concrete (a massive part of the construction costs) doubled from 2000-2010; doubled again from 2010-2019 and nearly doubled again from 2019 until now (last one primarily due to a combnation COVID limiting supply lines and thhe current inflationary environment).

What would concern me most would be the site prep. The Rent was relatively affordable in large part due to the land being donated. While an on campus football stadium likely would be built on school owned land (no additional costs for land acquisition), there are a number of areas with wetland concerns in and around the campus. Site prep to stabilize the land base for a stadium and also prevent the possibility of contaminating the surrounding water table with runoff could easily run tens of millions of dollars before any construction begins.
For what it's worth the environmental impact study done for Toscano showed no adverse impact in building in the athletic complex, which would be the ideal spot in my opinion. I am a little concerned about the potential wetlands impact of the parking, though.
 
Joined
Mar 4, 2020
Messages
3,665
Reaction Score
7,531
Likely more than tripled. Concrete (a massive part of the construction costs) doubled from 2000-2010; doubled again from 2010-2019 and nearly doubled again from 2019 until now (last one primarily due to a combnation COVID limiting supply lines and thhe current inflationary environment).

What would concern me most would be the site prep. The Rent was relatively affordable in large part due to the land being donated While an on campus football stadium likely would be built on school owned land (no additional costs for land acquisition), there are a number of areas with wetland concerns in and around the campus. Site prep to stabilize the land base for a stadium and also prevent the possibility of contaminating the surrounding water table with runoff could easily run tens of millions of dollars before any construction begins.
You do know why the land was donated? Tons and tons of toxic debris, not to mention WW2 defused bombs, years and years of Chance Vought & Pratt & Whitney manufacturing debris, oil, rubber, metals, chemicals, lead paint. Where do you think all that stuff went? In the 1930’s and 40’s and after the war, stuff was just buried, very deep hopefully. It would have cost UTC billions to properly reclaim those 75 acres. Residential or business development was out of the question.
 

FfldCntyFan

Texas: Property of UConn Men's Basketball program
Joined
Aug 25, 2011
Messages
13,236
Reaction Score
47,530
You do know why the land was donated? Tons and tons of toxic debris, not to mention WW2 defused bombs, years and years of Chance Vought & Pratt & Whitney manufacturing debris, oil, rubber, metals, chemicals, lead paint. Where do you think all that stuff went? In the 1930’s and 40’s and after the war, stuff was just buried, very deep hopefully. It would have cost UTC billions to properly reclaim those 75 acres. Residential or business development was out of the question.
Since the early 1990's federal funds have been used to subsidize contaminated soil remediation and brownfield restoration. I don't doubt that any soil that had been contaminated (even if it had occurred many decades earlier) by petroleum or other chemicals or other forms of industrial waste would have had to have been professionally removed with the disposal fully documented. I also know (from what the companies that I've worked for during the past quarter century) that federal funds would have covered nearly the entirety of the costs (depending on the situation, 85%-95% if documented and supervised correctly).

I know of a handful of such projects within the northeast and numerous other projects throughout the rust belt where anywhere from $10mm to $45mm (per project) was funded by federal grants through DEEP. If the cost of doing this for the site work at Rentschler Field wasn't almost fully subsidized, someone didn't do their job (which is entirely possible).
 
Joined
Mar 4, 2020
Messages
3,665
Reaction Score
7,531
Since the early 1990's federal funds have been used to subsidize contaminated soil remediation and brownfield restoration. I don't doubt that any soil that had been contaminated (even if it had occurred many decades earlier) by petroleum or other chemicals or other forms of industrial waste would have had to have been professionally removed with the disposal fully documented. I also know (from what the companies that I've worked for during the past quarter century) that federal funds would have covered nearly the entirety of the costs (depending on the situation, 85%-95% if documented and supervised correctly).

I know of a handful of such projects within the northeast and numerous other projects throughout the rust belt where anywhere from $10mm to $45mm (per project) was funded by federal grants through DEEP. If the cost of doing this for the site work at Rentschler Field wasn't almost fully subsidized, someone didn't do their job (which is entirely possible).
I’ll pm you
 

Waquoit

Mr. Positive
Joined
Aug 24, 2011
Messages
33,612
Reaction Score
88,407
I heard they have a tank buried out there.
 
Joined
Aug 26, 2011
Messages
91,951
Reaction Score
352,140


-> UConn officials have submitted a request to the Board of Trustees ahead of a Wednesday meeting to approve a revised planning budget of $1.6 million – an increase of $1.125 million over the previously approved budget.

The funding will support planning for a major Gampel Pavilion renovation, “with the goal of modernizing the facility and creating more revenue-generating” opportunities within the arena, which opened in 1990 and has 171,000 square feet of space, according to the university. <-
 

UConnSwag11

Storrs, CT The Mecca
Joined
Aug 26, 2011
Messages
14,164
Reaction Score
55,638
“… and conducting a wi-fi survey and installing the first phase of wi-fi improvements and equipment upgrades.”

Oh My God Omg GIF by The Office
 

CL82

NCAA Men’s Basketball National Champions - Again!
Joined
Aug 24, 2011
Messages
59,382
Reaction Score
221,839
IMG_5171.jpeg

For 1.1 million in construction cost, I'd like to think we would get more than just upgraded seating and Wi-Fi. It will be interesting to see the details on what's being proposed. I'd love to see an exterior concourse, improved bathrooms, and concessions. An exterior concourse would also allow for additional seating.
 

FfldCntyFan

Texas: Property of UConn Men's Basketball program
Joined
Aug 25, 2011
Messages
13,236
Reaction Score
47,530
I'm amazed that there are still available funds from UConn 2000 bond issue.
 
Joined
Aug 27, 2011
Messages
660
Reaction Score
2,905
was the additional $650MM that was requested fully approved?
$625 million was approved.

UConn 2000 infrastructure program extension
“In May 2024, legislators approved a $4.4 billion bond bill that includes a four-year extension of the UConn 2000 infrastructure program. The extension includes $625 million in new bonding, and UConn is required to raise an additional $100 million in philanthropic commitments and gifts by June 30, 2031. The funding will be used to update STEM infrastructure, address deferred maintenance, and renovate Gampel Pavilion and athletic facilities.”
 
Last edited:

Online statistics

Members online
331
Guests online
2,321
Total visitors
2,652

Forum statistics

Threads
159,734
Messages
4,202,334
Members
10,072
Latest member
CTEspn


.
Top Bottom