- Joined
- Sep 26, 2011
- Messages
- 1,782
- Reaction Score
- 6,923
I don't think you can do much more with a round geodesic dome. I can't imagine them finding more space. But is it possible for them to have the two side corners open to a new annex where the field house currently is (or whatever the building is that is attached)? Basically, original Gampel stays as is, but you exit to a new area with bathrooms, concessions, lounge area, large screen tvs (although you don't want people to linger). Most arena concourses are outside of the viewing area anyway.Not a fan of luxury/club seating. Sit with the rest of the fans. And I don’t see a need to redo the entire concourse. Much of what Gampel needs could be fixed by simply enlarging the 4 corner areas where they currently have food/restrooms - especially on the 3 corners that serve as entrances/exits. There’s lots of room to build those areas out. Also, something could possible be done with the galley-like walking areas behind the last rows up top. Let’s not get crazy with this…keep it mostly as is.
I also wondered why UConn hasn't sold name rights to the arena. Harry A. was super generous, and maybe there is a contract that requires the name to stay for a certain amount of time or forever. But could they do some double naming? "Ted's Arena at the Harry A. Gampel Pavillion." Or, if we do the annex mentioned above, that gets separate naming rights.
