SteelCT
Student of the Game
- Joined
- Aug 25, 2013
- Messages
- 270
- Reaction Score
- 835
If they build fixed seats in the lower bowl they would be able to add some additional seating/boxes. Since the volleyball team is no longer playing in there it may be possible.
Hockey rink was a fiasco, original plans were for it to be bigger but construction costs skyrocketed post covid and forced a redesign that would still meet Hockey East criteria. Timeframe forced their hands.
Hockey rink was a fiasco, original plans were for it to be bigger but construction costs skyrocketed post covid and forced a redesign that would still meet Hockey East criteria. Timeframe forced their hands.
