I'll bet you there isn't asphalt on it...they will be like the rest of the spaces...3/4 stone and grass$775,000 to grade, drain, asphalt and paint? How many spaces are they talking about? If they are paying prevailing wage then why are they paying prevailing wage? It's a freakin parking lot.
$775,000 to grade, drain, asphalt and paint? How many spaces are they talking about? If they are paying prevailing wage then why are they paying prevailing wage? It's a freakin parking lot.
I can't express how much I hope that this is a sign that the Rent is about to be expanded and we are about to get a P5 invite.
Maybe... But just to temper expectation a bit... Remember they are losing parking to retail development going in on other side of Cabela that will effect Runway.
I believe it was the band Styx that sang "Killjoy, Killjoy"
Did they finally buy "the house" sitting in the blue lot?Homes being demolished on Silver Lane will give way to some of the additional parking spaces.
Did they finally buy "the house" sitting in the blue lot?
So if I'm reading that report right, 5.5 mil was set aside but they requested $775k? If that is correct, does that mean this is phase 1 of a larger parking plan? Or just trying to do things on the cheap (more likely)?
Right, but no mention of what the remainder of funds is allocated for. $500k could be for the CCC. Is that documented somewhere?I read it as $5.5m was earmarked for "ALTERATIONS, RENOVATIONS AND IMPROVEMENTS AT THE CONNECTICUT CONVENTION CENTER AND RENTSCHLER FIELD" - and they are only looking for an bond authorization allocation of $775k for additional parking.
Right, but no mention of what the remainder of funds is allocated for. $500k could be for the CCC. Is that documented somewhere?
One of the two homes was removed. I happened to drive by when they were demoing it.I always wondered about that house. I'm opposed to eminent domain but at what point does the owner cut bait and accept the deal? His property value had to plummet when the stadium was built.
One thing that I found interesting is that part of the plan is to "improve access to the roof." I have no idea what that means, practically.On from the UConn capital improvement page:
901888 11/9/2015 Gampel Pavilion Dome Ceiling and Roof Repair-Downes Construction Company $63,423.87
901888 11/19/2015 Gampel Pavilion Dome Repair- Downes Construction Company $63,423.87
901888 9/11/2015 Gampel Pavilion Dome Ceiling and Roof Repair-Fennick McCredie Architecture, Ltd $571,850.00
Maybe... But just to temper expectation a bit... Remember they are losing parking to retail development going in on other side of Cabela that will effect Runway.
Most likely for ongoing repairs/maintenanceOne thing that I found interesting is that part of the plan is to "improve access to the roof." I have no idea what that means, practically.
Yeah, Boat, but how? A catwalk?Most likely for ongoing repairs/maintenance