$775,000 to grade, drain, asphalt and paint? How many spaces are they talking about? If they are paying prevailing wage then why are they paying prevailing wage? It's a freakin parking lot.
 
Joined
Aug 27, 2011
Messages
7,498
Reaction Score
15,682
$775,000 to grade, drain, asphalt and paint? How many spaces are they talking about? If they are paying prevailing wage then why are they paying prevailing wage? It's a freakin parking lot.
I'll bet you there isn't asphalt on it...they will be like the rest of the spaces...3/4 stone and grass
 
Joined
Aug 26, 2011
Messages
92,035
Reaction Score
352,544
http://today.uconn.edu/2015/07/home-of-uconn-football-takes-new-name-as-pratt-whitney-stadium/

>>As part of the stadium agreement, UTC will contribute 10 acres of land to the state of Connecticut for additional stadium parking. UTC also will provide an easement for the use of an additional 15 acres adjacent to existing stadium parking, further expanding the parking available to UConn fans. <<

If what I was told is true - it's the wooded land to the "east"of stadium behind gray/orange lots (end of stadium opposite videoboard).
 
Joined
Aug 2, 2015
Messages
2,063
Reaction Score
2,638
http://ct.gov/opm/lib/opm/Agenda_Jan29_2016_APPROVED.pdf

Page 10/85 : 775,000 approved for rent parking
Page 40/85 : 1,500,000 allocated from the previous 35million for the XL center
"These funds are requested to finance ongoing planning and repairs at XL center in Hartford"

So, I know they didn't spend the entire 35 mill on the recent band-aid. I know some went to the SCI study and this must be the rest for continued # crunching for renovations/upgrade and needed repairs. (Place is falling apart)
 

SubbaBub

Your stupidity is ruining my country.
Joined
Aug 26, 2011
Messages
32,199
Reaction Score
25,191
$775,000 to grade, drain, asphalt and paint? How many spaces are they talking about? If they are paying prevailing wage then why are they paying prevailing wage? It's a freakin parking lot.

I'd guess anywhere from 700-1200. Parking lots cost money to build.
 

Dooley

Done with U-con athletics
Joined
Oct 7, 2012
Messages
9,960
Reaction Score
32,818
I can't express how much I hope that this is a sign that the Rent is about to be expanded and we are about to get a P5 invite.
 
Joined
Aug 26, 2011
Messages
92,035
Reaction Score
352,544
I can't express how much I hope that this is a sign that the Rent is about to be expanded and we are about to get a P5 invite.

Maybe... But just to temper expectation a bit... Remember they are losing parking to retail development going in on other side of Cabela that will effect Runway.
 
Joined
Aug 27, 2011
Messages
4,962
Reaction Score
18,942
Homes being demolished on Silver Lane will give way to some of the additional parking spaces.
 

huskypantz

All posts from this user are AI-generated
Joined
Aug 25, 2011
Messages
7,052
Reaction Score
10,182
So if I'm reading that report right, 5.5 mil was set aside but they requested $775k? If that is correct, does that mean this is phase 1 of a larger parking plan? Or just trying to do things on the cheap (more likely)?
 

huskypantz

All posts from this user are AI-generated
Joined
Aug 25, 2011
Messages
7,052
Reaction Score
10,182
Homes being demolished on Silver Lane will give way to some of the additional parking spaces.
Did they finally buy "the house" sitting in the blue lot?
 
Joined
Aug 26, 2011
Messages
92,035
Reaction Score
352,544
So if I'm reading that report right, 5.5 mil was set aside but they requested $775k? If that is correct, does that mean this is phase 1 of a larger parking plan? Or just trying to do things on the cheap (more likely)?

I read it as $5.5m was earmarked for "ALTERATIONS, RENOVATIONS AND IMPROVEMENTS AT THE CONNECTICUT CONVENTION CENTER AND RENTSCHLER FIELD" - and they are only looking for an bond authorization allocation of $775k for additional parking.
 

huskypantz

All posts from this user are AI-generated
Joined
Aug 25, 2011
Messages
7,052
Reaction Score
10,182
I read it as $5.5m was earmarked for "ALTERATIONS, RENOVATIONS AND IMPROVEMENTS AT THE CONNECTICUT CONVENTION CENTER AND RENTSCHLER FIELD" - and they are only looking for an bond authorization allocation of $775k for additional parking.
Right, but no mention of what the remainder of funds is allocated for. $500k could be for the CCC. Is that documented somewhere?
 
Joined
Aug 26, 2011
Messages
92,035
Reaction Score
352,544
Right, but no mention of what the remainder of funds is allocated for. $500k could be for the CCC. Is that documented somewhere?

This line item has been a budget carry-over/earmark for a number of the past years. increasing most years, year over year.

Not specifically the line item dollar breakdown per facility but more what the intended capital projects entail/planned: http://www.cceda.net/data/Unsorted/2014-2015_Annual_Report-73132-1.pdf (pages 7-10)
 
Joined
Aug 26, 2011
Messages
2,919
Reaction Score
8,978
I always wondered about that house. I'm opposed to eminent domain but at what point does the owner cut bait and accept the deal? His property value had to plummet when the stadium was built.
One of the two homes was removed. I happened to drive by when they were demoing it.
 
Joined
Aug 26, 2011
Messages
2,919
Reaction Score
8,978
On from the UConn capital improvement page:

901888 11/9/2015 Gampel Pavilion Dome Ceiling and Roof Repair-Downes Construction Company $63,423.87

901888
11/19/2015 Gampel Pavilion Dome Repair- Downes Construction Company $63,423.87

901888 9/11/2015 Gampel Pavilion Dome Ceiling and Roof Repair-Fennick McCredie Architecture, Ltd $571,850.00
 

CL82

NCAA Men’s Basketball National Champions - Again!
Joined
Aug 24, 2011
Messages
59,436
Reaction Score
222,166
On from the UConn capital improvement page:

901888 11/9/2015 Gampel Pavilion Dome Ceiling and Roof Repair-Downes Construction Company $63,423.87

901888
11/19/2015 Gampel Pavilion Dome Repair- Downes Construction Company $63,423.87

901888 9/11/2015 Gampel Pavilion Dome Ceiling and Roof Repair-Fennick McCredie Architecture, Ltd $571,850.00
One thing that I found interesting is that part of the plan is to "improve access to the roof." I have no idea what that means, practically.
 
Joined
Nov 8, 2011
Messages
1,886
Reaction Score
3,442
Maybe... But just to temper expectation a bit... Remember they are losing parking to retail development going in on other side of Cabela that will effect Runway.

image.jpg
 
Joined
Nov 25, 2012
Messages
6,090
Reaction Score
11,112
One thing that I found interesting is that part of the plan is to "improve access to the roof." I have no idea what that means, practically.
Most likely for ongoing repairs/maintenance
 
Status
Not open for further replies.

Online statistics

Members online
160
Guests online
2,079
Total visitors
2,239

Forum statistics

Threads
159,860
Messages
4,208,236
Members
10,076
Latest member
Mpjd2024


.
Top Bottom