Oh those Patoni tiles | The Boneyard

Oh those Patoni tiles

Joined
Aug 17, 2011
Messages
20,293
Reaction Score
116,527
O.K. so those were replaced but they're still having problems.

UConn is having problems with the recently replaced ceiling of its basketball arena.

The school spent $10 million last year replacing the decaying triangular insulated panels that make up the ceiling at the 10,000-seat Gampel Pavilion.

But officials told the Board of Trustees on Wednesday that it needs another $1.8 million for more work, including the installation of permanent dehumidifiers to deal with condensation that was discovered building up between the ceiling and the building's aluminum roof.


 
.-.
Such master craft work cannot be easily modified in these modern times.
 
44207
 

Forum statistics

Threads
168,326
Messages
4,564,180
Members
10,462
Latest member
Liam Rainst


Top Bottom