- Joined
- Aug 26, 2011
- Messages
- 103,680
- Reaction Score
- 428,003
If you know him, as I do, since his days at SCSU (SCSC then), this concern and the labored breathing are recentLike your fandom, he’s been breathing like that since ‘65
No, it's an autograph.Is that a check from Springer that Penders is holding?
Actually it contains Matt Barnes name and photo. I believe they are in the bullpen which Barnes donated $$ for.No, it's an autograph.
He can afford it. His base salary for 2021 is $4.7 million. He becomes free agent after 2021 and there should be a good list of teams that would want his services.Actually it contains Matt Barnes name and photo. I believe they are in the bullpen which Barnes donated $$ for.
From thread in UConn Hockey Forum:Where will the new hockey arena be built? I thought it would be across the street from Frietas near the softball field where the old baseball field was but there's now a soccer practice field there. I have to imagine it will be in part of the parking lot next to Freitas?
Daniel Connolly @DanielVConnolly 6m
As of now, construction is projected to begin in April 2021, finished in December 2022.
There’s no door. The baseboard trim is consistent throughout the photo.Is it just me or does it look like the diagonal bracing (for transient loads - wind/seismic) conflicts with a door in the upper left photo?
It's not just you. I thought the same thing.Is it just me or does it look like the diagonal bracing (for transient loads - wind/seismic) conflicts with a door in the upper left photo?
Dang Architects, never coordinating with the Structural Engineers.It's not just you. I thought the same thing.
“Well, we just figured you’d rather have a standing structure rather than easier access to the rubble.”Dang Architects, never coordinating with the Structural Engineers.
Dang Architects, never coordinating with the Structural Engineers.