On page 12, looked at the picture for campus construction by 2035 (just took a long sip from my Cap & Cole when I realized how old I will be by then) and a few notes:
1) I do not see a rink anywhere on campus
2) The Gampel Expansion is there; but, the footprint for the Wolff-Zackin Natatorium (pool) is gone. UConn building a new pool or axing the swim team?
3) Both S and X parking lots are gone, no surprise with parking garages going into each location plus one underthe trac k and another in Mansfield Apartments; but, I bet Mansfield will not like the idea of a 1,200 car parking garage and associated traffic to it right next to EO Smith High School in S lot
4) Still surprised that they are not going to swap the soccer game and practice facilities with the football practice fields to allow the football team to have 'on-site' access
5) Maybe this time old West Campus dorms and the abandoned Frat row will be replace
6) In a 100 years, which complex will be rebuilt more times, Grant MSG, the Student Union, or Babridge library?
7) Student rec maybe expanded on site or moved up behind McMahon?