https://updc.uconn.edu/wp-content/uploads/sites/1525/2018/08/2018.06.13_Project-Updates.pdf
On page 34 of the lastest Project Update a new site configuration is shown. The new soccer stadium and practice field will be located on existing baseball and softball fields. New softball field and performance center will be located on existing soccer field. New track field events area to be located adjacent to new baseball stadium. Existing Jim Calhoun Way will become a cul de sac and a new road will be constructed along the left field/third base side of J.O. Christian Field. Appears to be much better layout.
On page 34 of the lastest Project Update a new site configuration is shown. The new soccer stadium and practice field will be located on existing baseball and softball fields. New softball field and performance center will be located on existing soccer field. New track field events area to be located adjacent to new baseball stadium. Existing Jim Calhoun Way will become a cul de sac and a new road will be constructed along the left field/third base side of J.O. Christian Field. Appears to be much better layout.
Last edited: