Planning For Athletic Complex Infrastructure Upgrade is on the September 29th BOT Agenda. Revised budget is $1.200,000.00. A potential shared strength and conditioning building for Olympic sports on a site to be determined is mentioned.
http://boardoftrustees.uconn.edu/wp-content/uploads/sites/1799/2016/09/Att.-21-Southwest-Campus.pdf
http://boardoftrustees.uconn.edu/wp-content/uploads/sites/1799/2016/09/Att.-21-Southwest-Campus.pdf